Serving Siouxland for over 20 Years

No Dig Pipe Repair

No mess. In and out quickly.

No Dig Solutions

New Builiding?

Let us do the Plumbing!

New Construction

Technology Combined With Turnkey Project Support

Trenchless technology naturally reduces cost by delivering projects faster and without the need for costly repairs to fix damage created during the process.  As a regional trenchless leader, we not only deliver these benefits but also a lower cost of mobilization and faster response times.  Our project management procedure centers around leveraging our technology to reduce risk and plan workflow so that incidental loss and downtime are minimized.  Our combined benefits provide the lowest  total cost-of-completion.

PROJECT PHASE

Inspection

If needed, lines are cleared to temporarily restore operation and visibility in the line. Full system is inspected with reeled sewer cameras and CCTV robots. Video and report quickly uploaded for review via online reporting system.Inspection

SERVICES

  • Critical Path Management
  • Risk Mitigation
  • Incidental Loss Mitigation

Assessment

Using client requirements and inspection reporting, a project management plan is created for critical path planning designed to specify phases and technology application to minimize downtime and incidental loss.

  • Drain Cleaining
  • CCTV Inspection
  • Reporting

Solutions

Experts and supporting labor force are coordinated to carry out the projectmanagement plan. Project manager oversees crews while serving as a single point of contact for on-site facilities staff and project stakeholders.

  • Hydrojetting
  • Main & Lateral Lining
  • Lateral Reinstatements
  • Pipe Bursting
  • Directional Drilling

Warranty

In the event that an unforeseen event arises after project completion, ourworkmanship is backed on an ongoing basis by live answering staff and techinians available for dispatching 24/7.

  • 24/7 Live Response
  • Local Technicians
  • Workmanship Guarantee

 

Dealing With Crap 24/7. (712) 276–6837
View Career Options Yes, We’re Hiring!